Questions & Answers about the modernization in the Highdeck housing estate

* This page has been translated via Google's Cloud Translation API. HOWOGE does not edit the content.

General Information & Procedure

First, the houses at Michael-Bohnen-Ring 12-16 in the High-Deck-Siedlung district will be modernized.


The pipe renovation will take approximately four weeks, and please allow about five days for the window replacement. You will be informed of the exact dates in due course.


Yes, that's possible – provided your neighbor ensures access. Alternatively, the key can be left with security. A signed waiver of liability is required for this.


Unfortunately, this is not possible during riser pipe renovations, as several apartments on the same pipe run are being worked on simultaneously. For window work, arrangements can be made on a case-by-case basis.


The upper entrances to the buildings remain accessible. The lower entrances are temporarily closed due to construction equipment.


Please contact your HOWOGE service team. Additionally, there are tenant consultation hours with the local construction management.


There will be an initial tenants' meeting. In addition, regular tenant consultation hours will be held at the construction office. Dates will be announced by notice board or letter.


Working in the apartment

Kitchen furniture will be dismantled and stored by a professional company. Everything will be reassembled after the construction and painting work is completed. Please remove any personal belongings beforehand.


The kitchen will be only partially usable for about four days and will be fully restored after about two weeks.


The sanitary facilities are usually unavailable for two to three days. During this time, portable toilets are available in front of the building.


The heating system will remain operational. Hot water will be unavailable for approximately one week during the pipework renovation.


Yes. Sanitary containers with toilets, showers, and sinks are available on the property. Additionally, a toilet in a vacant apartment on the same floor can be used.


Yes. Shaft walls and pipes will be renewed, and sanitary fixtures will be replaced. Bathrooms that are already tiled will not be retiled.


Yes, all items mounted on the facade or balcony must be removed for the duration of the construction work.


Yes, during the work on the sewage pipes. HOWOGE will provide containers for this period.


Living & everyday life during the construction period

Yes, that's generally possible. The water will be shut off for the first few days; the toilet can be used provisionally from the fourth day. The sanitary facilities will be unavailable for approximately three days. The kitchen can be used again after about a week.


No. Please ensure that tradespeople have access to the apartment (e.g., by leaving a key with a neighbor or security guard). Please lock away your valuables.


Unfortunately, construction noise is unavoidable during the work.


Yes, the construction office holds regular tenant consultation hours. You can ask questions or clarify concerns there.


Living comfort & use after modernization

Yes.


No, the work is being carried out according to a uniform modernization standard.


Please discuss any planned changes with the service team on a case-by-case basis.


Increased living comfort, modern amenities, and improved energy efficiency. Further details can be found in the modernization announcement.


Special life situations

Yes, please contact the service team. A suitable solution will be found in consultation with our social management team.


The construction site is secured, but parents should still keep their children away from the construction area.


Yes, it can get noisy at times during the work. Unfortunately, that can't be avoided.


Please ensure that your animals are kept safe and stress-free during the work.


Please inform the service team as soon as possible. Together with our social management team, an individual solution will be found.


Sustainability & Future

Yes, all materials comply with applicable environmental and safety standards.


That depends on individual consumption. The renovation will create significantly better conditions for energy efficiency.


Through lower energy consumption and reduced CO₂ emissions, modernization makes an important contribution to climate protection and sustainable urban development.